Friday, June 29, 2012

Got the long shelf across front reinstalled and made a bracket to help support the middle of it.  Will need to stain and varnish it yet.  Painted lower side walls that will be inside benches.  Ray helped me straighten out how the wiring for overhead light was going.  Put new sockets on the overhead light. Will reinstall that to day now that I know how.  Think I will do another coat of varnish on front walls, etc.  Just to make sure it looks even.

Closet pics

 
Here are a couple of pictures of completed closet. 
Interior appears kinda blue but it is pale beige.

Wednesday, June 27, 2012

One closet done!

Got one closet done.  :) Shelf and hanger rod resized, painted, resized door reinstalled, planed to fit.  Vanished trim around it too. Will post pic soon.  Feels great to get the first one done.  Now the other one, it still needs everything done but the door.  Resizing the doors to fit a challenge.  Now angled to fit side walls that are now at an angle to accomidate at full size mattress for the bed.  Bye for today.

Sunday, June 17, 2012

A little more work done

Got ugly aluminum stove top tray removed.  Of course it was nailed under the countertop.  Had to loosen that up to pull the nails.  Have now figured out how I will install new stove top.  Will need to build a little box and top it with luan and same material using as backsplash.  Have to wait until get new side and backsplash up.  Too hot today to do more calculations, will do that another day.  Got little side wall of kitchen varnished and rest of the one closet primed.  Now to smelly in there to continue work inside trailer.  Ice tea time. Bye